KOCABAYIR WATER TANK, PUMPING STATIONS, TRANSFORMER SUBSTATION, TRANSMISSION LINE AND NETWORK CONSTRUCTION

PROJECT NAMEKOCABAYIR WATER TANK, PUMPING STATIONS, TRANSFORMER SUBSTATION, TRANSMISSION LINE AND NETWORK CONSTRUCTION
EMPLOYERTHE GREATER MUNICIPALITY OF ISTANBUL İSKİ GENERAL DIRECTORATE
LOCATIONISTANBUL-TURKEY
COMP. DATE2006
PROJECT DESCRIPTION15.000 m³  WATER STROGE
11.000 mt. TRANSMISSION PIPE LINE
18.000 mt. NETWORK PIPE LINE
800 KVA TRANSFORMER STATION